• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Heathrow Area Transport Forum

Heathrow Area Transport Forum

Heathrow Area Transport Forum

Working together for better surface transport access to Heathrow
  • Home
  • About
    • About
    • Meetings
      • 2026 Meetings
      • 2025 Meetings
      • 2024 Meetings
      • 2023 Meetings
      • 2022 Meetings
      • 2021 Meetings
      • 2020 Meetings
      • 2019 Meetings
    • HATF Board Members
    • Terms of Reference
  • HATF Work Programme
    • HATF Work Programme 2026
    • HATF Work Programme 2025
    • HATF Work Programme 2024
    • HATF Work Programme 2023
    • HATF Work Programme 2022
    • HATF Work Programme 2021
    • HATF Work Programme 2020
    • HATF Work Programme 2019
  • Resources
  • Contact us

HATF Wider Forum Meeting 19th November 2025 Minutes

23rd January 2026 by Adam

Filed under: 2025 Wider Forum.

1. Welcome 

Anthony Smith (AS) welcomed attendees to the HATF Event 2025.  

AS reflected on the work of HATF over 2025 and noted that the main topic for the day would be focussed on how to support the transport network around Heathrow if Expanding Heathrow goes ahead, but also with a continued focus on H8 as well.

2. Heathrow Update and Expansion 

Nigel Milton (NM) provided an overview of Heathrow expansion including aspects of Surface Access as well as Heathrow performance over 2025. Key points included:

  • 2025 will be the busiest ever year for Heathrow, with an estimated 84 million passengers. Although these are record numbers, service levels and punctuality remain high. The investment into improved security scanners is paying off and baggage reclaim has increased in reliability.
  • Heathrow submitted expansion proposals with the aim to reach to 150million passengers a year and double the existing cargo capacity.

3. Heathrow Surface Access 2025 Highlights

Sophie Chapman (SC) provided a Surface Access update and reflection on works completed in 2025. This included an update on Surface Access targets and progress towards them, as well as a summary of successes through 2025 (please find additional detail within slide pack):

  • Colleague travel survey was completed in 2024, with results provided in January 2025. This provides updated colleague mode share and travel behaviour and replaces outdated figures from 2017. The survey shows work from home data, which sits below the national average and reflects the operational nature of Heathrow. 
  • Way2Go is the Heathrow colleague commuting campaign and app for the ~90,000 Team Heathrow colleagues to encourage mode shift to sustainable modes. 
  • Passenger public transport mode share now sits at 46.1% which is above our 2026 target of 45%. 
  • SC touched on partnerships expanded this year, such as Flightline, which has been so successful that four more routes will be provided in 2027.

Q&A with NM and SC:

  • Questions asked by AS about how Heathrow is dealing with uncertainty on next steps; from Jonathan James (GTS) about how rail can play a part in bringing materials to site and whether there is sufficient workforce to deliver the plans; and from Rob Gray (Crane Valley Partnership) about net environmental benefits of Expanding Heathrow overall.
    • A: NM explained that policy certainty is required and understanding from Government on the next steps for rail; 
    • SC replied that the railhead in Colnbrook will play a significant part in bringing materials by rail and a transport plan is being developed to get workforce to site sustainably. Elizabeth line has helped to attract workers from new catchment areas
    • NM responded that Heathrow will make sure biodiversity regulations are met and replace what is lost. There will be regulatory requirements in place that Heathrow would need to follow, including a focus on reducing and mitigating impacts

4. Airport National Policy Statement (ANPS)

Catherine Holton (CH) provided an update on the progress of ANPS refresh:

  • CH gave an update on the timings of the ANPS review which will be consulted on in 2026 and explained that the government is reviewing responses from the two scheme promoters to make a decision on their preferred scheme by the end of November.
  • The Secretary of State will speak to the Climate Change Committee to seek their views.
  • It is yet to be determined if Heathrow expansion will be a critical national infrastructure project
  • The draft for public consultation is due before summer recess in 2026 which will give enough time to engage with stakeholders. There will also be parliamentary scrutiny of ANPS. Following consultation, the final version is due by the end of 2026.
  • DfT will publicise how they will engage with stakeholders on this, including HATF.
  • DfT is currently considering if there is value in a more strategic document covering Surface Access for an expanded Heathrow.
  • The ANPS review will set out the target(s) that the planning inspector will refer to.
  • David Hill (DH) questioned how confident are the DfT that the airspace change will be delivered in time for the third runway. CH responded that CAA are working with the teams to align dates.

5. CAA

Laurence Crook (LC) provided an overview of the role of CAA, more information provided within slides. In summary: 

  • CAA are currently working through a refresh of the Surface Access policy as the current policy is six years old. They expect to publish a consultation on the new Surface Access Policy in 2026. Cost benefits are currently determined for airport users only, not wider society. However, this will be included as part of the consultation. 
  • CAA incentivises service quality via measures, targets and incentives (MTIs). There are two specific Surface Access MTIs.

6. Panel Discussion: Getting more passengers and staff to and from the airport

Panel Discussion (Tim Leech (TL), Will Tuckley (WT), Alex Williams (AW), Martin Gilmour (MG) and Laurence Crook (LC)).

Key points discussed:

When asked what the panels ten-year vision is, responses included:

  • TL stated that it is to get people to Heathrow sustainably, to be able to operate the expanded airport efficiently, to make the area around Heathrow a better place to live and to support sustainable growth. 
  • WT stated that he hopes that Heathrow is seen as an asset, both locally and nationally, and that access is significantly enhanced through public transport. He went on to say that as a neighbour of Heathrow, Slough is excited by Heathrow future as it helps growth, but local impacts on noise and quality of life is a key concern.
  • AW is keen to see expansion in line with the ANPS and ensure that there is no more additional road traffic, achieved through good quality investment in public transport. 
  • LC stated that supporting the growth agenda and Heathrow expansion should be balanced against not giving a scheme provider a blank cheque, and also having concern for delivery timescales. 
  • MG stated that their vision would be to enable expansion subject to ANPS requirements. 

AS asked how Heathrow will achieve no more car movements:

  • AW stated that the challenge is enormous as expansion will generate an additional 40m trips on the public transport network and the M25 is already saturated. He stated that there will be additional capacity in the form of the the new Piccadilly and Elizabeth line trains and investment in the Superloop, but that tt could be time to reassess the Heathrow Express as it is an expensive service. AW noted that connectivity is key, especially western and southern rail access. A preferred route should be chosen and then get on with delivering it.

AS asked WT how people in Slough are going to get to the airport:  

  • WT said that we need to seriously invest in public transport to if growth at Heathrow is to be achieved. He went on to say that there is a strong positive case for investment in Western Rail now, even without expansion, and that case becomes stronger still in a 3-runway world. Lastly, he noted that there would be a need to improve the walking and cycling environment and infrastructure and also increase awareness of bus and coach options. AS agreed that Heathrow needs to promote bus and coach more. 

AS asked TL whether Heathrow would give up the Heathrow Express: 

  • TL stated that the Heathrow Express paths are vital for the commercial and operational case to deliver new rail schemes to Heathrow. Heathrow Express also the offers passengers a differentiated high-quality, quick and airport-specific proposition which is of value to protect public transport mode share from passengers who may switch to taxi rather than Elizabeth line in the absence of HEx.

AS asked Hannah Godfrey (Gatwick) how they are going to achieve their 55% public transport mode share target and how Gatwick achieved success on maintaining the Gatwick Express:

  • HG responded that Gatwick’s main focus is on earlier and later services, which is particularly important given the 24 hour operation of the airport. In relation to the Gatwick Express HG noted that the airport has a strong relationship with the rail operator and also takes a similar view to Heathrow in acknowledging that the Gatwick Express is a valuable option for customers and frees up capacity on other services.

AS put it to MG that the government have said this is a private sector project, but how does the government’s role come in: 

  • MG noted that the consideration at the moment is as to whether the most helpful thing is to simply share a target (for mode share) in July, or whether to instead think about what else could sit alongside that in terms of how it can be achieved. He noted though that whatever the figure is it would be a minimum. But the bottom line is that this is a private project and shouldn’t be funded by the private purse. 

AS asked of AW whether TfL would put some money on the table: 

  • AW responded that TfL had already funded 94 new Picadilly line trains, 10 new Elizabeth line trains, and improvements to the bus network, but noted that this is the time to invest in the Picadilly line signalling upgrades and that there needs to be a negotiation about who pays for that. 

Tracey Waltho (CISHA) asked that in the previous iteration of expansion works, the local authorities and local communities were worried about the ANPS targets not being met and how can they build their trust with Heathrow?

WT stated that trust is very important, and that polling in Slough shows that trust is higher than it has been but still hovering around 50%, and that more uncertainty leads to greater lack of trust. He also noted that the housing market had been affected. However, Slough are keen to get on with planning out new public transport services and have also come up with new rules around parking in the area. However, his final thought was that the more uncertainty there is the more challenge there is on trust. Steve Costello (Southern Rail) stated that regulation is key and asked how expansion plans tie in with the H8 business plan and resilience.

  • LC responded that international benchmarking will be taking place, and agrees that there is an overriding need for efficiency.

7. Breakout session

Groups considered their top three Heathrow Surface Access priorities over the next ten years, which have been grouped into the following categories:

Rail:

  • Need a clear position on Southern and Western rail access. There is a need to clear up the current uncertainties on this
  • Rail has an important role to play to unlock capacity and connectivity, and a clear funding framework needs to be agreed in order to progress this

Bus and Coach:

  • Roll out a Heathrow BSIP with clear guidance on how local councils can improve infrastructure to support uptake of buses
  • Have real time information for bus departures to increase confidence to users
  • Undertake more marketing and promotional work to increase awareness of the services available in and around Heathrow
  • Prioritise and provide bus lanes and bus gates to maximise benefits of buses
  • Ensure the bus station(s) are world class and managed and operated in a way that improves passenger experience
  • Provide a 24/7 network 

Ensure the network has the right routes, frequencies and operating hours for employees

Public Transport:

  • Provide a more seamless journey from public transport to check in / arrivals 
  • Increase reliability of services, to increase confidence of potential users
  • Better signposting of information and communications

Embedding in accessibility Stakeholder Engagement:

  • Do not forget the local community when making any changes or improvements
  • Public transport should be open to and used by local communities and not just colleagues and passengers

Active Travel: 

  • Continue to progress the Local Cycling and Walking Infrastructure Plans (LCWIP) 
  • Provide options for the first and last mile
  • Provide shared paths around the campus and connecting to local areas for wheeling and walking and ensure that cycle lanes are taken seriously 

Cargo:

  • Provide a freight super hub, to reduce disruption to the communities
  • Better waiting area for drivers and the vehicles
  • Consider whether rail can be used instead of road

Incentivisation:

  • A balance between ’carrot’ and ‘stick’ approaches is needed for both colleagues and passengers to achieve mode shift. Do more to influence travel behaviours such as integrated ticketing or use of AI to influence decision making
  • Make sustainable options more attractive
  • Assess terminal drop off charge to disincentive car 

Local community:

  • Surrounding areas for locals should be better after expansion work than they are now 
  • The local environment should be safe and welcoming

AS summarised these contributions into the common themes of: promotion; bus and coach; the importance of rail and need for a clear funding mechanism; and freight. 

8. Closing Remarks

AS summarised conversations of the event and noted that Surface Access impact of expansion is much bigger than just the transport links if the project does go ahead. There are a lot of moving parts and that it is complicated, and bigger than the airport and can only be treated as a private sector scheme up to a point. 

Primary Sidebar

  • About
  • Meetings
    • 2026 Meetings
    • 2025 Meetings
    • 2024 Meetings
    • 2023 Meetings
    • 2022 Meetings
    • 2021 Meetings
    • 2020 Meetings
    • 2019 Meetings
  • HATF Board Members
  • Terms of Reference
  • Home
  • About
  • HATF Work Programme 2026
  • Resources
  • Contact us

© 2026 Heathrow Area Transport Forum

  • Privacy policy
  • Website terms and conditions