• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Heathrow Area Transport Forum

Heathrow Area Transport Forum

Heathrow Area Transport Forum

Working together for better surface transport access to Heathrow
  • Home
  • About
    • About
    • Meetings
      • 2026 Meetings
      • 2025 Meetings
      • 2024 Meetings
      • 2023 Meetings
      • 2022 Meetings
      • 2021 Meetings
      • 2020 Meetings
      • 2019 Meetings
    • HATF Board Members
    • Terms of Reference
  • HATF Work Programme
    • HATF Work Programme 2026
    • HATF Work Programme 2025
    • HATF Work Programme 2024
    • HATF Work Programme 2023
    • HATF Work Programme 2022
    • HATF Work Programme 2021
    • HATF Work Programme 2020
    • HATF Work Programme 2019
  • Resources
  • Contact us

HATF Board Meeting 20th January 2026 Minutes

27th February 2026 by Adam

Filed under: 2026 HATF Main Board.

Present

Anthony Smith (AS) – HATF (Chair)  
Mark Frost (MF) – HATF (Independent Technical Advisor)
Liz Garlinge (LG) – National Highways (Network Development Director)
Lindsey Olliver (LO) – Regional Co-ordinating Officer (Unite the Union)
Shamal Ratnayaka (SR) – Transport for London (Aviation Strategy Lead) 
Matt Haywood (MH) – Network Rail (Lead Strategic Planner) 
Keith McNally (KM) – CPT UK (Operations Director)
Peter Bradley (PB) – UK Coach Operators Association (UKCOA) (Managing Director) 
Christian Wolmar (CW) – London Cycling Campaign (Trustee)
Tanvi Vyas (TV) – Heathrow Access Advisory Group
Nigel Wicking (NW) – Airline Operators’ Committee (AOC) (Chief Executive)
Alan Tilly (AT) – Hillingdon Council (Transport Planning and Development Team Manager)
Jack Harrison – Department for Transport (Head of Surface Access, Heathrow Expansion Directorate)
Sophie Chapman (SC) – Heathrow Airport Limited (HAL) (Surface Access Director)
Tim Leech (TL) – HAL (Head of Strategy and Sponsorship, Surface Access)
Andy Watson (AW) – HAL (Long Term Growth – Surface Access Lead)
Simi Kullar (SK) – HAL (Sustainable Travel Manager)
Sarah Turner (ST) – HAL (Sustainable Travel and Policy Lead)Sam Berry (SB) – HAL (Policy Lead)

Apologies

Susan James (SJ) – Transport Watchdog (Head of Casework)

Live Actions

Action 20

HAL to assess impact of expansion on active travel work and develop an annual LCWIP monitoring report to show progress against each spoke

Update: Underway, to be presented at a future HATF board in Heathrow update.
Date opened: 02/04/2025
Owner: HAL
Target completion date: March 2026

Action 25

HAL: to provide more detail about plan for hitting the target for carbon emissions

Update: Underway, to be presented at a future HATF Board in Heathrow update.
Date opened: 02/04/2025
Owner: HAL
Target completion date: March 2026

Action 27

HAL to look into understanding Kiss and Fly users, and how we can move them along the ‘Sustainability Spectrum’ onto parking or more sustainable modes.

Update: Underway, to be presented at a future HATF Board in Heathrow update.
Date opened: 11/06/2025
Owner: HAL
Target completion date: March 2026

Action 33

HAL to add MTI reporting to HATF dashboard

Update: Underway, to be presented at a future HATF board in Heathrow update.
Date opened: 19/11/2025
Owner: HAL
Target completion date: March 2026

Action 34

HAL to share if HAL is on live bus information programme list

Update: New action item: January 2026 Board
Date opened: 20/01/2026
Owner: TfL
Target completion date: March 2026

Action 35

HAL to share where passengers are coming from alongside the mode split, alongside the mode split, and also how the overall PT total breaks down across modes.

Update: New action item: January 2026 Board
Date opened: 20/01/2026
Owner: HAL
Target completion date: March 2026

Action 36

AS to produce blog post on Christmas Day bus services.

Update: New action item: January 2026 Board
Date opened: 20/01/2026
Owner: HAL
Target completion date: March 2026

Action 37

HAL: check PHV pick up experience.

Update: New action item: January 2026 Board
Date opened: 20/01/2026
Owner: HAL
Target completion date: March 2026

Action 38

HAL to share audit with HAAG.

Update: New action item: January 2026 Board
Date opened: 20/01/2026
Owner: HAL
Target completion date: March 2026

Action 39

Mark: gather HATF members views on the vision document and what should/should not be included.

Update: New action item: January 2026 Board
Date opened: 20/01/2026
Owner: HAL
Target completion date: March 2026

1. Welcome and Introductions

The Chair, Anthony Smith (AS), welcomed attendees to the first Board meeting of 2026.  

2. Minutes and actions from previous meeting 

Action Updates

Simi Kullar (SK) provided updates on action 30 (HAL to share accessibility audit findings), which SK presented later in the meeting. The other actions remain open.

3. Heathrow update 

Mode Share Comparison

Sophie Chapman (SC) shared a mode share comparison of London airports, based on 2024 CAA data:

  • LCY is much further ahead due to central London location and being well served by public transport.
  • AS asked if there is comparable Profiler data between airports, to which Tim Leech (TL) shared only LGW and LHR does this survey.
  • AS asked for an update with the ongoing CAA and LHR difference in data. TL explained why the two data sets vary, and noted that HAL are working with DfT and CAA to try to rectify this but that it is unlikely the two will ever be brought together, and that Profiler data is still very useful as an ongoing comparison. TL noted that CAA are planning to increase the number of passenger interviews conducted next year.
  • SC stated that an issue with reporting based on CAA data is the delay in publishing data (which tends to be a year after it is taken as a full year’s worth of data needs to be weighted).
  • AS asked how HATF could help with this and whether they should write to the CAA and DFT to support.  Jack Harrison (JH) responded that the DfT are already aware of the issue and in discussions with HAL and CAA about this
  • Shamal Ratnayaka (SR) added that STN has higher public transport mode share due to the distance from city centre, which means rail journey times compare very favourably to road and the traveller profile (low-cost airlines) which supports the especially high coach mode share.
  • Keith McNally (KM) suggested that it would be good to see where passengers are coming from alongside the mode split, and also how the overall PT total breaks down across modes. 

Business Update

SC shared a business update. In summary:

  • Terminal 4 Front Door project is going through governance at the moment to secure the initial funding.
  • AS asked that as passenger numbers increase, are there areas that are coming under pressure? SC responded that the next generation security has helped reduce what could have been a pinch point, however the baggage system is still an area of concern. Nigel Wicking (NW) shared that baggage handling, general operations and resourcing levels are generally where they should be. The base carrier (BA) has been performing well through 2025, which has an important role in supporting general smooth running of Heathrow’s operations. In 2026 we are looking at Terminal 2 baggage, T4 forecourt and Command & Control (in the event of failures, how does Heathrow respond and recover quickly). NW added that passenger demand is currently beyond the technical capacity of the airport.

AS shared Susan James (SJ) recent experience at Private Hire Vehicle pick up at Terminal 5, stating it was crowded.

Mode Share (Profiler data):

  • 46.26% passenger public transport moving annual average which is the highest figure it has ever been.
  • There have been incremental changes month on month for December compared to November 2025.
  • 2025 experienced much more reliability on the rail network, compared to previous years which has increased general perception of rail as a viable mode for passengers.

Project Updates:

  • Spelthorne are pleased to see significant reductions in the impact of private hire and black cabs parking in Stanwell following the PSPO introduction, and have recently published this article ‘Hundreds’ receive penalties for illegal parking on Surrey streets near Heathrow Airport | Surrey Live. AS added that both Local Authorities and HAL have done very well in developing an effective partnership approach in tackling parking issues. 
  • Central bus station works to provide four new coach bays are progressing which will improve capacity by 36% It should open Q4 2026, with works due to commence in April 2025.
  • AS asked SR if TfL has a programme for rolling out for live bus information and if so, whether Heathrow is on the list.
  • Peter Bradley (PB) noted the success of the Christmas Day 111 bus service and suggested that improvements could be made on how TfL helped to advertise these Christmas Day services. AS agreed that this was very successful and took an action to write a blog post on this. 
  • SC shared that the project to improve the toilet facilities in the Authorised Vehicle Area (AVA) is currently underway, as a result of HATF Parking SIG. This is envisaged that it would help with local parking issues and get more PHV drivers to use the AVA.
  • EV charging for Authorised Vehicle Area and Taxi Feeder Park are progressing through design.

Active Travel:

TL shared an update on active travel projects:

  • As a result of ongoing H8 settlement process, there could be a smaller capital funding envelope to continue many of the projects proposed by Heathrow, which includes a number of live active travel projects from H7. Combined with lighting issues which have led to significant cost increases, this has resulted in a risk of the active travel CTA project pausing. He added that an alternative way to improve active travel provision that HAL are looking at is to install a series of cycle hubs around the campus that are connected to frequent shuttle bus services. 
  • A meeting between Heathrow and AS and Christian Wolmar (CW) took place in December 2025 to discuss next steps. AS is going to explore how best to engage with the CAA about the H8 settlement, and work with Heathrow’s Surface Access team on the viability of the proposed “hub” model
  • CW shared his disappointment and stated this should be higher up Heathrow’s priority list.
  • Lindsey Olliver (LO) shared that there are union members who are making noise about this, especially operational colleagues such as those working in baggage.
  • NW stated the main tunnel project has been delayed over many years and increase significantly in cost. The main tunnel must come first before cycling can come.
  • SR shared that it is frustrating and that there is an obligation to connect with surrounding areas for those on bikes

Expansion update

  • SC shared that HAL still needs reassurance on some matters including regulation and Airports National Policy Statement (ANPS) refresh.
  • On regulation: 2 consultations have been sent out by CAA. The first relates to early costs that will be recovered in 2025 and 2026. The other one is broader and more about how expansion will be regulated over the longer-term.
  • In Spring, the CAA will review the Surface Access policy about investment in surface access schemes and this will be via a consultation, to which HATF should respond.
  • The Airports National Policy Statement (ANPS) determines the conditions of expansion, DfT are working on this and should release a draft by July. This will also be a consultation.

Liz Garlinge (LG) queried how these consultations impact HATF work this year and asked whether AS thinks consultation outcomes will change the 2026 work programme. SC responded that if the early costs consultation resulted in cost constraints, Heathrow would be more selective on what we spend money on, but we also have government timescale to meet. MF set out that there is a plan of rolling agendas for the HATF Board already set out, but that these key items will need to be incorporated. TL added that Expansion related topics will also be covered in the HATF Expansion Special Interest Group.

4. Accessibility Audit: Surface Access 

SK presented the accessibility audit following an April 2025 board action, further information including audit table provided within slides:

  • SK shared the importance of accessibility at Heathrow, including increase of Passengers Requiring Assistance. 
  • HAL has focussed on physical disabilities, however sensory and neurodivergent disabilities should be considered more. 
  • Audit will be shared with HAAG and point of contacts will be asked for updates every 6 months.
  • SR shared that Hatton Cross is on the continuous programme longlist for step free access, and TfL has spoken to HAL and BA about this.
  • PB also requested that group coach travel was added as a line into the audit. 
  • Tanvi Vyas (TV) suggested tapping into the Heathrow HAND network to understand how disabled colleagues commute. 

5. Department for Transport Update 

Jack Harrison (JH) provided an update on the work DfT are doing covering Heathrow expansion: 

  • DfT will publish draft ANPS before summer recess and there will be a public consultation. 
  • A stakeholder engagement approach has been published for these works including facilitating round tables with stakeholder groups.
  • They will also be aiming to publish a vision for Surface Access for Expansion alongside any changes to the ANPS

6. HATF 2026 Workplan

Mark Frost (MF) summarised key areas of focus for HATF in 2026 based of Board member conversation and 2025 HATF Event discussions which include:

  • Expansion: DfT ANPS consultation and “Vision” document; CAA review of regulation models, Surface Access Policy and H8 proposals.
  • Rail – focus on deliverability and to get optimum network delivered for all users
  • Bus – Developing the draft Bus Service Improvement Plan further, and ensure further consideration into realising the potential of coaches.
  • Continue to progress Parking SIG to build on success, and assess demand management, modal shift and what tools/levers we have.
  • Review Local Cycling Walking Infrastructure Plan (LCWIP) – what can and can not happen as a result of Expansion and how we can work with LAs to best realise the wider, sub-regional network. 
  • Ensure continuing visibility by board on implications of growth on cargo and freight movements. 
  • Accessibility to continue as BAU work. 

7. HATF Heathrow Expansion Special Interest Group

Andy Watson (AW) shared information on HATF Expansion Special Interest Group (SIG), with further information provided within the slides.

  • ANPS sets out that HATF is essential to setting out the Surface Access strategy, and HATF will be important in DCO hearings.
  • AS added that HATF has a large amount of influence
  • The first meeting will take place on 12th February

8. AOB

None.

HATF Board Meeting 20th January 2026 SlidesDownload

Primary Sidebar

  • About
  • Meetings
    • 2026 Meetings
    • 2025 Meetings
    • 2024 Meetings
    • 2023 Meetings
    • 2022 Meetings
    • 2021 Meetings
    • 2020 Meetings
    • 2019 Meetings
  • HATF Board Members
  • Terms of Reference
  • Home
  • About
  • HATF Work Programme 2026
  • Resources
  • Contact us

© 2026 Heathrow Area Transport Forum

  • Privacy policy
  • Website terms and conditions