• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Heathrow Area Transport Forum

Heathrow Area Transport Forum

Heathrow Area Transport Forum

Working together for better surface transport access to Heathrow
  • Home
  • About
    • About
    • Meetings
      • 2026 Meetings
      • 2025 Meetings
      • 2024 Meetings
      • 2023 Meetings
      • 2022 Meetings
      • 2021 Meetings
      • 2020 Meetings
      • 2019 Meetings
    • HATF Board Members
    • Terms of Reference
  • HATF Work Programme
    • HATF Work Programme 2026
    • HATF Work Programme 2025
    • HATF Work Programme 2024
    • HATF Work Programme 2023
    • HATF Work Programme 2022
    • HATF Work Programme 2021
    • HATF Work Programme 2020
    • HATF Work Programme 2019
  • Resources
  • Contact us

HATF Board Meeting 19th March 2024 Minutes

27th March 2024 by Adam

Filed under: 2024 HATF Main Board, Meetings.

Present

Anthony Smith – HATF (Chair)
Mark Frost – HATF (Independent Technical Advisor)
Polyvios Polyviou – Business LDN (Programme Director, Transport)
Peter Bradley – UK Coach Operators Association (UKCOA) (Managing Director)
Nigel Wicking – Airline Operators Committee (Chief Executive)
Wayne King – Unite the Union (Regional Secretary)
Keith McNally – Confederation of Passenger Transport (Operations director)
Christopher Bate – National Highways (Senior Planning Manager)
Christian Wolmar – London Cycling Campaign (Trustee)
Matt Haywood – Network Rail (Lead Strategic Planner)
Shamal Ratnayaka – Transport for London (Aviation Strategy Lead)
Sophie Chapman – HAL (Surface Access Director)
Tim Leech – HAL (Head of Strategy and Sponsorship, Surface Access)
Tim Wells – HAL (Sustainable Travel & Policy Lead)
Simi Kullar – HAL (Sustainable Travel Manager)
Matthew Wooll – HAL (Route Development Lead)
Lucas Taylor – HAL (Sustainable Travel Manager)
Sam Berry – HAL (External and Government Affairs Manager)

Apologies

Matthew Furniss – Surrey County Council
Paul Millin – Heathrow Strategic Planning Group (HSPG) (Chair, Transport Subgroup)
Jo Grew – Network Rail(Industry Programme Director (Heathrow & TVA))
Liz Garlinge – Highways England(Strategic Projects Director)

Live Actions

No. 2

Action: Provide update on catchment analysis target
Update: Include on June 2024 agenda when 2023 analysis will be available.
Owner: TW, HAL
Date opened: 27/09/2023
Target completion date: March 2024

No. 5

Action: Look at type of taxis arriving at airport e.g. electric/fossil fuel split
Update: Data to be reviewed and captured if required
Owner: TW, HAL
Date opened: 27/09/2023
Target completion date: Q1 2024

No. 10

Action: Christopher Bate will reach out to MF regarding designated funding for active travel
Update:
Owner: National Highways
Date opened: 27/11/2023
Target completion date: June 2024

No. 11

Action: Will share Parging SIG action plan with minutes
Update: Shared with minutes
Owner: HAL
Date opened: 19/03/2024
Target completion date: March 2024

1. Welcome and Introductions

The Chair, Anthony Smith (AS), welcomed attendees to the second Board meeting of 2024.

Welcomed Polyvios Polyviou (PP), who has joined the board representing BusinessLdn.

2. HAL Update

Sophie Chapman (SC) provided a Heathrow update:

  • The Civil Aviation Authority (CAA) has finalised the H7 (2022-2026) settlement which has resulted in a 20% reduction in the price Heathrow can charge airlines.
  • This means we need to find ways to increase revenue, reduce Opex and ensure all investment business cases demonstrate significant value.
  • For Surface Access, we need to maximise the benefits of our investment by getting more people onto new Sustainable Travel Zone (STZ) routes through increasing awareness and marketing. Any support from this group to increase usage will be appreciated.
  • Heathrow is revising its business strategy. An update on any plans for growth
  • and expansion will be provided later this year, once this process has completed.
  • Disruption on trains using the Great Western Railway continues, which has been ongoing since major problems on this line emerged in 2023. HAL staff have had a high level meeting with Andrew Haines, Chief Executive at Network Rail to escalate this matter, and have been provided some further detail of the approach they are taking to resolve these issues as quickly as practicable which has provided some reassurance.

Surface Access Strategy Targets

  • SC presented an update on mode share, with passenger public transport at just
    over 44%.
  • PP: does mode share include active travel? Tim Leech (TL): no as this data is just
    for passengers and we do not expect passengers to cycle or walk (the few that
    do will be captured as other). Active travel is more relevant for colleague travel
    and we have a colleague travel survey taking place this year which will provide
    updated data.
  • Mark Frost (MF): there is a low Piccadilly line mode share for February 2024
    (11%), are new trains in 2025 hoped to help there? SC: New trains will definitely
    help, delivering a 10% increase in capacity. Need to note there was a Piccadilly
    line outage over half term which could have contributed to this low figure.

Passenger Satisfaction:

SC: people continue to rate kiss and fly highly as it is the most convenient door to door
mode. We are seeing improvement in Elizabeth line.
AS: why is taxi and mini cab heading down? SC: could be due to Terminal Drop Off
Charge (TDOC) cost that was introduced in November 2021, or simply improved public
transport.

2024 plans for Surface Access Strategy:

  • Data will play a big role this year, so a Data Strategy will be developed. Data will
    help to support surface access and carbon monitoring and decision making.
  • Taxi and Private Hire Strategy (PHV) is near completion, whilst the Heathrow
    Bus Service Improvement Plan (BSIP) continues to progress.

Carbon and sustainability projects:

SC provided an update on progress of Carbon and Sustainability Programme projects:

  • Central Terminal Area (CTA) cycling project is a significant project for many
    stakeholders. The completion of the project is subject to main tunnel
    refurbishment being completed, which should be completed in Q4 2025

MF: what is the importance of Piccadilly line signallingin terms of TfL’s negotiation with
government? Shamal Ratnayaka (SR): it is high on the list, and also links to provision of new (net additional) rolling stock, which would allow us to make full use of increased
frequencies. Timescales are not clear at present.

3. Sustainable Travel Zone (STZ) 2023 Annual Report

Matthew Wooll (MW): summarised the Year 2 STZ report, which has been published.

AS: the percentage increase in operational times and patronage sound impressive, but
what are the passenger numbers behind that? Are you able to get a colleague and
passenger split? MW: Not able to share passenger numbers due to commercially
sensitive nature, however we are pleased with numbers and will continue to monitor. A
colleague and passenger split is not possible, however we do have some colleague
specific ticketing data.

MF: How will this continue to be funded, noting the business savings required? MW: we
will continue to prioritise funding where colleagues are located and if there are
alternatives or not – we are working with operators and local authorities on this.

AS: when will you share plans to increase marketing of bus services. TL: we can add this
to the agenda for next time, as we are working with marketing teams currently to
increase awareness.

4. Local Cycling and Walking Infrastructure Plan (LCWIP) – Progress Update

By way of a one-year update, Christian Wolmar (CW) introduced attendees to the
LCWIP and work of the Active Travel SIG.
Simi Kullar (SK) provided an update on LCWIP for the spokes (Local Authorities and TfL)
and hub (Heathrow) routes, please see slides for further information:

  • TfL, Hounslow, Slough Surrey, and Spelthorne are all working on cycle routes as
    part of the LCWIP spokes.
  • Heathrow continues to progress projects on perimeter roads including a shared
    use path along Southern and Eastern Perimeter Road and access into CTA.

MF: Do National Highways have an interest in funding a gap in cycling infrastructure ona combination of National Highways and LB Hillingdon roads, via designated fund? CB – further discussion necessary.
AS: why is tunnel project so long? TL: it’s been a long-running project with many
engineering challenges – current programme is for completion in late 2025.

5. Council for the Independent Scrutiny of Heathrow Airport
(CISHA) and Parking Special Interest Group (SIG) update

AS provided an update, noting the latest CISHA and Parking SIGs took place in January:

  • Parking issues continue, including recent increase of black cabs waiting in local community areas, private hire remains an issue.
  • Local authorities are continuing work including Slough progressing a Controlled Parking Zone (CPZ) for Poyle and Colnbrook and Spelthorne consulting on a PHV Public Space Protection Order (PSPO).

Tim Wells (TW) provided an update on Local Community Parking Action Plan:

  • Reporting portal is being progressed which will help with tracking reports from
    residents.
  • Produced and distributed signs to be put up in local communities.
  • Secured an advert in private hire trade magazine, to increase awareness of
    Authorised Vehicle Area (AVA)
  • Leafleting drivers who are seen waiting on local roads.

Other stakeholders:

  • British Parking Association (BPA) meet and greet operator code of practice
    launched on 29th February; HAL continue to work closely with BPA to ensure it is
    marketed well

MF: has there been an increase in colleagues parking in local communities since Ultra
Low Emission Zone (ULEZ)? TW: no, we have not seen an increase in this since ULEZ
started, but will keep an eye out on reports, the reporting tool should help keep track of
this

6. Heathrow Bus Service Improvement Plan (BSIP) Update

MF: BSIP is being progressed and aiming to finalise in coming months. See slides for
summary.

AS: Customer satisfaction will be a good metric to include.

7. AOB

MF: is there an update on the use of the non-ULEZ compliant colleague car park? TW:
usage peaked in late-2023 at around 170 daily users and has since been falling. After
monitoring and consulting Team Heathrow businesses we have made the decision to
close the car park at end of May. Communications went out on 1st March to provide
colleagues with 3-months’ notice.

HATF Board Meeting 19th March 2024 SlidesDownload
Local Community Parking Action Plan March 2024Download

Primary Sidebar

  • About
  • Meetings
    • 2026 Meetings
    • 2025 Meetings
    • 2024 Meetings
    • 2023 Meetings
    • 2022 Meetings
    • 2021 Meetings
    • 2020 Meetings
    • 2019 Meetings
  • HATF Board Members
  • Terms of Reference
  • Home
  • About
  • HATF Work Programme 2026
  • Resources
  • Contact us

© 2026 Heathrow Area Transport Forum

  • Privacy policy
  • Website terms and conditions